• Firestone
  • Firestone

Schedule: Completed Fall 2022
Project Manager: Todd Merchant
Architect: Black River Design & Payette
Contractor: PC Construction                      

The University of Vermont’s Larner College of Medicine’s objective for the addition to the Health Science Research Facility (HSRF) was to construct approximately 62,250 gross square feet in four stories with a mechanical penthouse to align with the floor levels at HSRF.  The building’s program consists of flexible research lab space, with associated lab support, write-up and office spaces, and core spaces for circulation, conference rooms, and kitchenettes.  The new labs will function collaboratively across disciplines by allowing multiple research groups to work together in combined spaces with shared resources.  The new addition is accessed through HSRF and through an accessible entrance at the south.  The appearance matches the style and materials of HSRF and provides state-of-the-art mechanicals for all spaces. 

This building was designed to meet a minimum of LEED Silver, certification pending.