Introduction
Policies and Procedures
Policies and Procedures
| Section Title | Revision Date |
|---|---|
| Permit Process (pdf) | 1/11/2024 |
| Project Review (pdf) | 5/28/2024 |
| Treatment of Historic Properties (pdf) | 2/21/2024 |
Design Criteria
Design Criteria
| Section Title | Revision Date |
|---|---|
| Custodial Rooms (pdf) | 11/10/2023 |
| General Purpose Classrooms | final review in progress |
| Lab Design Guidelines | in development |
| Loading Docks (pdf) | 11/10/2023 |
| Trash and Compost Areas (pdf) | 11/10/2023 |
| Restroom Design Criteria | final review in progress |
| CCTV Cameras (pdf) | 2/28/2023 |
| Blue Lights (pdf) | 2/28/2023 |
| Digital Access Controls (pdf) | 2/28/2023 |
| Automated External Defibrillators (AEDs) (pdf) | 2/13/2023 |
Division 03 - Concrete
Division 03 - Concrete
| Section Title | Revision Date |
|---|---|
| Cast in Place Concrete - Exterior (pdf) | 07/28/2021 |
Division 04 - Masonry
Division 04 - Masonry
| Section Title | Revision Date |
|---|---|
| Exterior Masonry Stairs (pdf) | 5/28/2024 |
| Exterior Masonry Walls | final review in progress |
| Maintenance/Restoration of Unit Masonry (pdf) | 2/21/2024 |
| Veneer Unit Masonry (pdf) | 11/10/2023 |
Division 05 - Metals
Division 05 - Metals
| Section Title | Revision Date |
|---|---|
| Metal Railings - Interior | final review in progress |
| Metal Stairs | final review in progress |
| Railings - Exterior | final review in progress |
| Steel Bollards (pdf) | 07/28/2021 |
| Steel Lintels (pdf) | 07/28/2021 |
Division 06 - Wood, Plastics, and Composites
Division 6 - Wood, Plastics, and Composites
| Section Title | Revision Date |
|---|---|
| Architectural Wood Shelving (pdf) | 07/28/2021 |
| Rough Carpentry (pdf) | 07/28/2021 |
Division 07 - Thermal and Moisture Protection
Division 07 - Thermal and Moisture Protection
| Section Title | Revision Date |
|---|---|
| Air and Moisture Management (pdf) | 07/29/2021 |
| Applied Fireproofing (pdf) | 07/28/2021 |
| Dampproofing and Waterproofing (pdf) | 07/29/2021 |
| Intumescent Coatings (pdf) | 07/29/2021 |
| Joint Sealants (pdf) | 10/16/2023 |
| Metal Roofing and Trim (pdf) | 10/16/2023 |
| Roof Specialties (pdf) | 07/29/2021 |
| Simple Ply Roofing Membrane (pdf) | 07/29/2021 |
| Slate Shingle Roofing (pdf) | 07/29/2021 |
| Thermal Insulation (pdf) | 07/29/2021 |
| Traffic Coating Membranes (pdf) | 07/29/2021 |
Division 08 - Doors and Hardware (Openings)
Division 08 - Doors and Hardware (Openings)
| Section Title | Revision Date |
|---|---|
| Aluminum Doors and Frames (pdf) | 11/10/2023 |
| Aluminum Entrances and Storefronts (pdf) | 07/29/2021 |
| Aluminum Windows (pdf) | 07/29/2021 |
| UVM CATCard | Please contact catcard@uvm.edu to request these standards |
| Door Hardware | final review in progress |
| Evaluation and Repair Recommendations for Wood Windows (pdf) | 10/16/2023 |
| Fiberglass Windows (pdf) | 07/29/2021 |
| Flush Wood Doors (pdf) | 11/10/2023 |
| Hollow Metal Doors and Frames (pdf) | 07/29/2021 |
| Interior Access Doors, Hatches, and Frames (pdf) | 07/29/2021 |
| Interior Glass Partitions (pdf) | 07/29/2021 |
| Louvers (pdf) | 07/29/2021 |
| Mirrors (pdf) | 10/17/2023 |
| Overhead Doors - Exterior (pdf) | 07/29/2021 |
Division 09 - Finishes
Division 09 - Finishes
| Section Title | Revision Date |
|---|---|
| Acoustical Ceiling Systems (pdf) | 10/31/2023 |
| Carpeting | final review in progress |
| Gypsum Wallboard (pdf) | 10/31/2023 |
| Interior Painting and Coatings (pdf) | 10/31/2023 |
| Resinous Flooring | final review in progress |
| Tiling (pdf) | 10/31/2023 |
Division 10 - Specialties
Division 10 - Specialties
| Section Title | Revision Date |
|---|---|
| Demountable Partitions (pdf) | 10/31/2023 |
| Display and Marker Boards and Rails | final review in progress |
| Portable Fire Extinguishers and Cabinets (pdf) | 11/10/2023 |
| Photoluminescent Exit Specialties (pdf) | 11/10/2023 |
| Restroom Stall Partitions | final review in progress |
| Signage | final review in progress |
| Toilet Accessories | final review in progress |
| Wall and Corner Guards (pdf) | 11/08/2023 |
Division 11 - Equipment
Division 11 - Equipment
| Section Title | Revision Date |
|---|---|
| Bicycle Parking | final review in progress |
| Electric Vehicle Supply Equipment | final review in progress |
Division 12 - Furnishings
Division 12 - Furnishings
| Section Title | Revision Date |
|---|---|
| Counter Tops (pdf) | 11/08/2023 |
| Entrance Mats (pdf) | 11/08/2023 |
| Outdoor Seating | in development |
| Window Treatments (pdf) | 11/08/2023 |
Division 14 - Conveying Equipment
Division 14 - Conveying Equipment
| Section Title | Revision Date |
|---|---|
| New Elevators | final review in progress |
| Existing Elevators - Retrofit | final review in progress |
Division 21 - Fire Suppression
Division 21 - Fire Suppression
| Section Title | Revision Date |
|---|---|
| Fire Pumps (pdf) | 11/08/2023 |
| Hood Mounted Fire Suppression Systems (pdf) | 11/08/2023 |
| Residential Kitchen Fire Suppression Systems (pdf) | 11/08/2023 |
| Water Based Fire Suppression Systems (pdf) | 11/08/2023 |
Division 22 - Plumbing
Division 22 - Plumbing
| Section Title | Revision Date |
|---|---|
| Drinking Fountains | final review in progress |
Division 23 - Heating, Ventilating, and Air Conditioning
Division 23 - Heating, Ventilating, and Air Conditioning
| Section Title | Revision Date |
|---|---|
| Air Terminal Box Controls (pdf) | 11/08/2023 |
| Automatic Temperature Controls (pdf) | 04/13/2023 |
| General Interior Mechanical Piping | in development |
| Terminal Air Units (VAV Boxes) (pdf) | 11/08/2023 |
Division 26 - Electrical
Division 26 - Electrical
| Section Title | Revision Date |
|---|---|
| Exterior Lighting | final review in progress |
| Interior Lighting | final review in progress |
Division 27 - Communications
Division 27 - Communications
| Section Title | Revision Date |
|---|---|
| UVM Telecom Standards (pdf) | please email telecom@uvm.edu if you have questions |
Division 28 - Electronic Safety and Security
Division 28 - Electronic Safety and Security
| Section Title | Revision Date |
|---|---|
| Fire Alarm Systems | final review in progress |
Division 32 - Site and Grounds (Earthwork)
Division 32 - Site and Grounds (Earthwork)
| Section Title | Revision Date |
|---|---|
| Fencing (pdf) | 11/29/2023 |
| Lawn Preparation and Seeding (pdf) | 2/21/2024 |
| Modular Concrete Retaining Walls (pdf) | 11/10/2023 |
| Plantings (pdf) | 6/01/2024 |
| Pathways | final review in progress |
| Topsoiling | final review in progress |
| Tree Protection | final review in progress |