Prior to the commencement of any environmental remediation activity on campus such as asbestos abatement or lead paint removal. The Environmental Health & Safety office will notify occupants of the areas which may be impacted or disrupted by the project activities.

 

March 18, 2024: Asbestos Abatement 284 EAST AVE, 2ND FLOOR (FLOOR TILE / MASTIC TILE ADHESIVE)

BUILDINGS AND AREAS AFFECTED:
284 EAST AVE, 2ND FLOOR (FLOOR TILE / MASTIC TILE ADHESIVE)


WHAT IS HAPPENING?
As part of renovations, Environmental Hazards Management, Inc. will remove 5,133 square feet
of Thermal Systems Insulation.

DURATION OF WORK:
Start Date: Monday, March 18, 2024
Completion Date: Friday, April 12, 2024
Hours: 6-4:30

WHAT TO EXPECT:
2nd Floor flooring abatement will occur in 3 phases. A containment area under negative pressure
will be constructed in the building. During abatement, workers will wear personal and
respiratory protection. Areas will be clearly marked and should not be entered unless a
situation posing an Immediate Danger to Life and Health (IDLH) occurs, and if possible, this
entry should be made with personal and respiratory protection.


CONTACT NUMBERS:
Environmental Health & Safety Phone: (802)656-7233
Physical Plant, Service Operations Support Phone: (802)656-2560

April 9, 2024: Asbestos Abatement Patrick Gymnasium Women’s C010 and Men’s C011Swim Locker Rooms. (Thermal Systems Insulation)

BUILDINGS AND AREAS AFFECTED:
Patrick Gymnasium Women’s C010 and Men’s C011Swim Locker Rooms. (Thermal Systems
Insulation)


WHAT IS HAPPENING?
As part of renovations, Environmental Hazards Management, Inc. will remove of 772 Linear
Feet of Thermal Systems Insulation.


DURATION OF WORK:
Start Date: Monday, April 09, 2024
Completion Date: Friday, April 19, 2024
Hours: 6-4:30


WHAT TO EXPECT:
Patrick Gymnasium Women’s C010 and Men’s C011 Swim Locker Rooms TSI abatement will
occur in 2 Phases. A containment area under negative pressure will be constructed in the
building. During abatement, workers will wear personal and respiratory protection. Areas will
be clearly marked and should not be entered unless a situation posing an Immediate Danger to
Life and Health (IDLH) occurs, and if possible, this entry should be made with personal and
respiratory protection.


CONTACT NUMBERS:
Environmental Health & Safety Phone: (802)656-7233
Physical Plant, Service Operations Support Phone: (802)656-2560