Renovation to the Billings Library

Billings Library

The Billings Library

Images:

 

Schedule: Phase I - Early 2016; Phase II - Spring/Summer 2017
Project Manager: Ken Bean
Project Architect: Schwartz/Silver Architects
Contractor: TBD

The renovation of this facility will include a phased approach for the historic structure and the upper level of the 1984 addition.  The scope of work for the third floor will enhance the interior surfaces and lighting and develop a climate controlled area for the public spaces of the North Lounge and Main Lobby, Apse, and the Marsh Room. The upper level 1984 addition, which encompasses the dining facility known as the Cook Commons, will include a complete reconfiguration of the space to accommodate compact shelving and support offices.  The infrastructure modifications required to serve the Library will include a new chilled water line from the campus central chilled water plant to serve the air conditioning needs.  New heating and ventilation equipment will also be installed.