Cosmogenic Nuclide Laboratory and Geomorphology Research Group
Plans for the New Lab
We are very excited to have moved into a new, purpose-built
facility that will replicate all the functions of the previous lab. The
rebuilt lab has a total of 5 laminar flow, fully exhausting fume hoods.
The lab redesign focussed on both safety and efficiency with the goal of
providing a facility that could run 24/7. All boron-bearing materials
were avoided during reconstruction.The lab redesign was done by IDC and the
construction management by ReArch of South Burlington, VT.

Across the hall is a dedicated mineral separation lab where we extract pure quartz. Downstairs is a rock preparation facility.
Here, you can download a PDF of the as-built lab drawings.
Last modified June 23 2009 05:31 AM
