The Addition

Before any building.

I rented a backhoe for much of the digging, but also did an awful lot with wheelbarrow and shovel. The dirt went to build the raised terraces in the previous picture.
Stage one of building. Anchor Foundation poured the footings one day, then the walls the next. Here the walls are being poured.

S.D. Ireland poured the cement for the walls.
More Pics