Class
Schedule 2011-spring
Thurs 4-6:45PM
DATE | TOPIC | READING | HOMEWORK | FIELD TRIP/Guest |
Class 1: |
Intro |
Chiras book chapter 1 |
Research Internships, contact employers |
|
Class 2 Jan. 27 |
Solar Hot Water |
Chiras book chapter 3 PV manual Chapter 3 |
Read about solar Hot Water systems
|
|
Class 3 Feb. 3 |
Quiz on Solar H2O System Design/Loads |
Photovoltaic Manual Chapter 4 |
For next time:
|
|
Class 4 Feb. 10 |
Renewable Energy Systems/Load Calculations PV systems
|
Review Load Calculations Chiras book chapter 7 |
Load Calcs due For next time: Exercises A-F in PV Manual Chapter 2. or see lecture notes Prepare for PV quizz
|
|
Class 5: Feb. 17 |
PV QUIZ Components: Controllers, batteries, inverters, meters |
Chiras book chapter 7 Photovoltaic Manual Chapter 6,7,8 |
For next time:
|
|
Class 6 Feb. 24 | Photovoltaic systems Wiring, Integration | Solar Photovoltaic Chiras book chapter7 Photovoltaic Manual 9,10,11 |
Due: ppt presentation on components For next time: Draw diagram and Calculate amps in circuit Exercise 9.3
|
|
Class 7 Mar 3 |
Photovoltaic systems Integration
|
see lecture notes for HW | Batteries, controllers, inverters, study for quiz.
|
|
Class 8-Mar 10 |
SPRING BREAK |
|||
Class 9-Mar 17 | PV Integration |
PV manual Chapter 10 |
PV Systems quiz HW: Read chapter 10 again. Sample Exercise
10.4 page 119 in PV manual Use equations on PV page here |
|
Class 10-Mar 24 | Wind | Study lecture notes for HW Chiras book chapt 8 |
PV Integration quiz Wind HW |
|
Class 11-Mar31 | Wind | Study lecture notes for HW Chiras book chapt 8 |
Wind HW due Wind system integration HW:
Assume 8.33KWH/day and 10mph (4.5m/s). Look at 5 data sheets: Pick one and design an offgrid system with 3 days storage, and priority
AC Watts of 3900W. Refer to: For controller, use turbine RATED (max) power to determine controller amps, just like we used PV panel max Watts before. Bonus. If you were grid tied, how much extra kwh/month would you have?
|
|
Class 12-April 7 |
Hydro | Head and flow measurements Chiras book chapt 9 |
Wind system integration HW due hydro systems HW. Answers may be found in ppts on lecture page |
|
Class 13- |
hydro measurements | Chiras book chapt 9 | No quiz HW: Design an offgrid hydro system with 3 days storage, and INVERTER: priority AC Watts of 3900W DAILY LOAD: 8.33KWH/day CONTROLLER: Use turbine max power to determine controller amps, just like we used PV panel max Watts before. Find an actual controller online. Morningstar, Xantrex, Outback, Blue-sky, etc. BATTERIES: Use Trojan (be sure to use Renewable energy link) or Rolls/Surrette. go to website and pick one. use 6V or 2V cells. DO NOT USE 12V BATTERIES! DO NOT PUT BATTERIES IN PARALLEL! Two sites: Pick a turbine for each site. See: or find your own. Bonus: extra kwh/day if grid tied? |
|
Class 14 |
biodiesel | Hydro system due Biodiesel |
Anju Dialu-guest speaker on biofuels | |
Class 15 April 28 |
last class | Draft webpage for internship in word or html format with pictures. Review Final project Design assignment |
||
May 5 | Internship Hours Due | Internship Hours Due. Total Hours and short evaluation by supervisor INTERNSHIP FORM | ||
May 13 | Final report Due by 5PM hard copy to 617 Main St. | Final RE design report due. RE system GRID-TIED WITH BATTERY BACK UP, designed to match
your load calculation. Please include: Think of this like a report to a client who is considering the purchase
of an RE system. Please make it neat and professional.
|