• (802) 656-4277
  • seagrant@uvm.edu
  • 81 Carrigan Drive, Burlington, Vermont

Sustainable Road Salting Practices: Pre-wetting

This fact sheet outlines the process of pre-wetting as a sustainable road salt practice. Pre-wetting is the process of adding a saltwater mixture (called brine) to dry rock salt.