Harris Millis Parking Lot Catch Basin Repairs

What Is Happening?
The catch basin in the Harris Millis parking lot is being repaired. Pavement will be removed from around the catch basin, and a new drainage pipe will be installed. Pavement will be reinstalled.

Duration of Work:
The work will begin on Tuesday, June 5, 2019 and will be completed by Thursday, June 13, 2019

full story >>>

Waterman Entrance Doors Replacement

What Is Happening? Replacement of the North and South Entrance Doors at the Waterman Building

Duration of Work: June 3, 2019 – June 7, 2019

full story >>>

Williams Hall Fire Escape Improvements

What Is Happening? 
The three fire escapes on the exterior of Williams Hall are being refurbished.  There will be additional railings and steel added, they will be painted, and one way gates and fencing will be added at the bases of each. All work will be conducted outside of the building.
Duration of Work:
May 20 - August 23, 2019

full story >>>