Royal Tyler building exterior

Royall Tyler Roof (2018)

This project involved replacing the upper and lower asphalt shingle roof with a standing seam copper roof.  Additionally, the brick was cleaned with a historic wash and the mortar was repointed. Some brick was replaced in designated areas, along with replacing storm windows with new more-efficient storm windows. This project improved the building envelope and provided a much-needed facelift to this historic gem in the center of campus.

Rowell Hall building facade

Rowell Hall Roof (2018)

This project was an entire roof replacement for Rowell Hall --approximately 20,100 square feet. The project consisted of the removal of existing roof system, including 3” ridged insulation and roof membrane, 5-9” of bituminous material, stone ballast of varying thicknesses, and the removal of appurtenances from the roof, and abatement of small amounts Asbestos Containing Materials (ACM).  The installation of new roof system included a fully adhered 90 Mil EDPM membrane, tapered insulation, fully adhered 4” polyiso insulation (minimum thickness), the installation of metal caps, drip edges, scuppers, sealants and associated hardware.

Wheeler Barn Restoration (2017)

Project elements included painting exterior, installing new basement stairs and new interiro stairs, replaced wood framing and rotted wood, installed new steel beams, installed new windows, new concrete slab in basement and restored stone foundation.

grassemount hall brick

Grassemount Exterior Renovations (2013)