Workplans and Logistics


2006 Field Season

Aquatics workplan (doc). Contains the cooperative agreement lanquage and workplan details.

Thermokarst workplan (doc). Contains the cooperative agreement lanquage and workplan details.

Time Line (xls). Contains the latest daily logistics plan, with detailed estimates of chopper time, fuel use, and touchdowns.

Flight Schedule (xls). Contains the latest flight departure and arrival information the shuttles from Fairbanks, through Bettles, to Feniak Base camp and back.

Key Sites (xls). This is a simple list of latitudes and longitudes of sampling locations. This file also contains the proposed location identification codes for the stream and lake sample sites in 2006.

Chemical list (xls). This file contains a consolidated list of the chemicals that will be used by the Aquatics Team in the field. These are the names, forms, and amounts of materials that will need to be transported.

NPS Master Logistics List (URL). This is the master list of all ARCN logistics dates relevant to the Freshwater and Terrestrial initiatives. This general logistics framework should align with the more detailed Aquatic and Thermokarst Time Line file, post above.


2005 Field Season

Aquatics workplan (doc) Contains the cooperative agreement lanquage and workplan details.

Time Line (doc). Contains a Gannt chart for the 2005 sampling plan