Project Archive

Project Description Dates
Patrick Gym Parking Lot Paving in the PFG lot in the location of the new waterline installation.
For details, click here.
November 1-3, 2010
28 Fletcher Place Parking area reconstruction. The existing parking area will be demolished and the parking area will be re-graded to address drainage issues. The parking area will be paved and a new concrete sidewalk will be added.
For details, click here.
October 26 - November 16, 2010
Williams, Angel Concrete sidewalk updates between Williams and Angel. Existing asphalt walkways between Williams and Angel will be replaced.
For details, click here.
October 25 - November 12, 2010
North Campus Steam Line Steamline and Chilled Water Line Distribution Project.
For details, click here.
September 2010 Update, click here.
For site plan and map, click here.
September 2010 pedestrian map update, click here.
Summer 2010
Billings, Williams Billings loading area re-surfacing/Williams Sidewalk.
For details, click here.
For project map, click here.
August 16-23
Wheeler House Portions of the foundation will be waterproofed, the porch and handicap access ramp will be reconstructed, and there will be excavation adjacent to the foundation along the south and east walls.
For details, click here.
August 16 - October 30 2010
Centennial Field Demolition of three buildings and installation of a new settling tank at the Grounds Garage.
For details, click here.
August 2 - 30 2010
Music Building A selection of windows will be replaced and/or repaired.
For details, click here.
June 29 - August 24 2010
Waterman Building Exterior South Elevation (College Street) - Painting of Wood Trim
For details, click here.
July - September 2010
Kalkin - Votey Plaza Reconstruction - The plaza between the Votey and Kalkin buildings will be removed and restored to allow for waterproofing of portions of each building's foundations. New utility lines will also be installed.
For details, click here.
For project map, click here.
July 27 - September 30, 2010
Wadhams Building Porch Replacement.
For details, click here.
Summer 2010
Forbrush Swimming Pool: Filter Replacement Replaced existing sand filter with a new EPD filtration system and 500 gallon surge tank.
For project details see: Forbush Pool Filter Replacement
April - May 2009
Marsh Life Science: Central Chilled Water Connection For project details click here.
For project Map click here.
December 2008 - April 2009
Royall Tyler Theater (RTT) Plaza Steps The front plaza of the Royall Tyler Theater was restored.
For more details, click here.
Summer 2008
Williams Hall Asbestos Abatement on Windows Asbestos abatement activities on exterior windows.
For details, click here.
May - July 2008
Williams Hall Exterior Renovation Renovation of brick work and windows.
For details, click here.
May - August 2008
Harris Hall Asbestos abatement activities to accommodate interior building renovations and window replacement.
For details, click here.
May - June 2008
Christie-Wright-Patterson Water Main The water main line on east side of Patterson Hall was replaced.
For details, click here.
May 2008
Pomeroy Hall Exterior Painting and Windows Pomeroy Hall was painted and the exterior windows were replaced.
For details, click here.
August - September 2008
Patrick Gym Circle & Connector Road The PFG Circle and Connector Road was completed with paving, curbing and re-seeding of circle.
For details, click here.
August - September 2008
Votey Hall - Underground Condensate Line Repair Physical Plant repaired underground condensate line next to the south side of Votey Hall in Shuttle Bus roadway.
For details, click here.
June - July 2008
Billings Center Plaza Reconstruction The area around each side of Cook Commons will be rebuilt, along with the stairs that lead to the Votey parking lot from the plaza on the south side of Ira Allen Chapel; and the plaza north of Ira Allen will also be rebuilt.
For details, click here.
May - September 2008
Terrill Hall Asbestos abatement activities throughout Terrill Hall to accommodate planned renovations. Flooring and ceiling materials as well as caulking, pipe and thermal system insulation was removed.
For details, click here.
March - May 2008
Agricultural Engineering Building - Asbestos Abatement Asbestos abatement activities to prepare for building demolition.
For details, click here.
May - June 2008
282 East Ave Parking Lot Relocation of the Bus Charging Stations from the Aggie Engineering Building to the south edge of the 282 East Avenue parking lot.
For details, click here.
November - December 2007
Votey - Perkins Steam Line Replacement Steam line replacement.
For details, click here.
August - November 2007
Fleming Museum Roof repairs.
For details, click here.
July - September 2007
Ira Allen Chapel Exterior renovation.
For details, click here.
May - October, 2007