| Bldg. # | Building | Summary | Dates | Notices |
|---|---|---|---|---|
| 0001 | 284 East Avenue | Room 124 Bathroom
To accommodate renovations, staff from TMC Services, Inc. will remove 48 Square Feet of Vinyl Asbestos Floor Tile and associated Adhesive. |
2012.08.14 - 2012.08.14 | |
| 0328 | Converse Hall | Room 235
The Physical Plant Training and Compliance Office will stabilize approximately 10 square feet of loose paint and plaster. |
2012.08.13 - 2012.08.13 | |
| 0251 | Dana Medical Library | Rooms 105, 106, 107, 108, 108A, 113, 120G, 120H, 123 and 124
ServPro will steam clean carpet affected by a recent water intrusion and then set up and leave equipment running to dry the carpet. |
2012.08.10 - 2012.08.11 | |
| 0071 | Given Medical Complex, C Building | Room C104B
Environmental Hazards Management, Inc. will clean mold growth from walls and surfaces inside the cold room. |
2012.08.08 - 2012.08.08 | |
| 0251 | Dana Medical Library | Hall 199 and Area 100
ServPro will steam clean approx. 5000 square feet of carpet affected by a recent water intrusion. After the cleaning ServPro will set up and leave equipment running to dry the carpet. |
2012.08.03 - 2012.08.05 | |
| 0052 | Englesby House | Room 108 Kitchen Area
Environmental Hazards Management, Inc. will remove 20 linear feet of pipe insulation. |
2012.07.24 - 2012.07.27 | |
| A328 | Cook Building | Rooms A310 & A315
As part of renovations, Environmental Hazards Management, Inc. will remove 772 square feet of countertops; transite lab hoods, cabinets and pipes and 20 linear feet of thermal system insulation. |
2012.07.16 - 2012.07.30 | |
| 0052 | Englesby House | Various Areas
As part of renovations, Environmental Hazards Management, Inc. will remove 226 linear feet of pipe insulation and 4 square feet of sink coating material. |
2012.06.25 - 2012.07.20 | |
| 0164 | Wheeler House | Rooms 104 & 206
As part of renovations, Environmental Hazards Management, Inc. will remove 50 square feet of linoleum and 6 linear feet of thermal system insulation. |
2012.07.11 - 2012.07.12 | |
| 0388 | Living and Learning C Buidling | Rooms C163, C164, C165 & C193
Environmental Hazards Management, Inc. will remove 12 square feet of cement block and 304 square feet of sheetrock wall. |
2012.07.11 - 2012.07.12 | |
| 0388 | Living and Learning C Buidling | Rooms C185 & C186
Environmental Hazards Management, Inc. will remove 6 linear feet of thermal system insulation and sheetrock walls affected by mold. |
2012.07.10 - 2012.07.11 | |
| 0160 | Waterman Building | North Flat Roof
Environmental Hazards Management will remove 4 square feet of gasket material associated with duct work on the roof. |
2012.07.09 - 2012.07.09 | |
| 0355 | Hamilton Hall | Various Rooms
To facilitate renovation of the residential complex, Environmental Hazards Management, Inc. will remove a total of 88 linear feet of thermal system insulation and 3,324 square feet of textured ceiling material from various rooms. |
2012.05.14 - 2012.07.06 | |
| 0353 | Mason Hall | Various Rooms
To facilitate renovation of the residential complex, Environmental Hazards Management, Inc. will remove a total of 90 linear feet of thermal system insulation and 4,138 square feet of textured ceiling material from various rooms. |
2012.05.14 - 2012.07.06 | |
| 0075 | Health Science Research Facility | Room 127
ServiceMaster Elite will remove approx. 44 square feet of water damaged sheetrock and clean wall studs. |
2012.06.28 - 2012.06.28 | |
| 0086 | Marsh Life Science | Room 330
Environmental Hazards Management, Inc. will remove 24 square feet of asbestos containing countertop and associated adhesive, and 336 square feet of floor tile and associated mastic. |
2012.06.18 - 2012.06.21 | |
| 0328 | Converse Hall | Various Rooms (101, 231, 508, 531 and 538)
Staff from the Physical Plant Training and Compliance office will stabilize paint throughout the building. |
2012.06.11 - 2012.06.19 | |
| 0160 | Waterman Buidling | Room 230
At part of renovations, Environmental Hazards Management, Inc. will remove 284 square feet of plaster ceiling. |
2012.06.04 - 2012.06.15 | |
| 0086 | Marsh Life Science | Rooms 331, 333 & 3rd Floor Hallway
The Physical Plant Training and Compliance Office will perform mold remediation, which will consist of cutting the sheetrock walls to remove suspected mold growth. |
2012.06.06 - 2012.06.06 | |
| 0160 | Waterman Buidling | Room 539
TMC Services, Inc. will remove 2,967 square feet of a combination of plaster ceiling, sheetrock wall and flooring material. |
2012.05.21 - 2012.06.01 | |
| 0103 | Central Heat Plant | 2nd Level
The Physical Plant Training and Compliance Office will remove 3 linear feet of pipe insulation from the steam line. |
2012.05.20 - 2012.05.20 | |
| 0160 | Waterman Buidling | Rooms 540, 541 & 541A
TMC Services, Inc. will remove 384 square feet of squirrel damaged ceiling tiles and clean the ceiling grids. |
2012.05.18 - 2012.05.18 | |
| 0082 | Hills Agricultural Science | Rooms 222, 227, 235
Environmental Hazards Management, Inc. will remove 334.5 square feet of counter top and fume hoods. |
2012.05.14 - 2012.05.25 | |
| 0126 | Allen House | Basement
The Physical Plant Training and Compliance Office will perform mold remediation, which will consist of cutting the sheetrock and homosote walls to remove suspected mold growth.. |
2012.05.07 - 2012.05.21 | |
| 0126 | Cook Building | Rooms A128 A230, A231, A233, A328, A329, A330, A331 and the tunnel system
As part of the laboratories renovations, Environmental Hazards Management, Inc. will remove 945 square feet of hoods, counter tops and adhesive, cabinet liners, transite duct vent pipes and 156 linear feet of thermal system insulation. |
2012.04.30 - 2012.06.07 | |
| 0156 | Votey Building | HVAC System
Members of the New England Service Group will inspect and assess the building's HVAC system for possible maintenance requirements and upgrades. |
2012.05.14 - 2012.05.14 | |
| 0355 | Hamilton Hall | Tunnel
TMC Services, Inc. will remove fiberglass insulation from the steam system. After removal, the tunnel and steam lines will be treated with H2Orange2 Concentrate 117 to neutralize any mold present and inhibit new growth. |
2012.04.16 - 2012.04.30 | |
| 0126 | Cook Building | Rooms A321
To accommodate renovations, Environmental Hazards Management, Inc. will remove 142 square feet of carpet, vinyl asbestos floor tile and associated adhesive. |
2012.04.23 - 2012.04.24 | |
| 0160 | Waterman Building | Room 303
The Physical Plant Training and Compliance Office will clean contaminated ceiling tiles with asbestos debris in preparation to replace the drop ceiling. |
2012.04.10 - 2012.04.10 | |
| 0040 | Billings Hall | Room B140
The Physical Plant Training & Compliance Office will remove 1 linear foot of asbestos caulking and 16 square feet of sheetrock to repair damaged wall board. |
2012.04.09 - 2012.04.09 | |
| 0408 | Mercy Hall | Rooms 007, 018A, 020, 021
To enable renovations and relocation of Custodial Offices, Environmental Hazards Management, Inc. will remove 36 linear feet of asbestos mudded fittings from pipes above the drop ceiling. The hallway outside rooms 007, 020 and 021 will be closed off for the duration of the work. Students needing to use the laundry room should access it via the north stair tower. |
2012.04.02 - 2012.04.06 | |
| 0412 | Sichel Hall | Room 107
Environmental Hazards Management, Inc. will remove approximately 80 square feet of affected sheetrock. |
2012.03.07 - 2012.03.07 | |
| 0036 | Bailey Howe Library | South Entry Doors
To facilitate replacement of the south entry doors, staff from TMC Services Inc. will remove all caulking associated with the door frames. |
2012.03.05 - 2012.03.06 | |
| 0036 | Bailey Howe Library | Room 008
Staff from the Physical Plant Training and Compliance Office will remove approximately 72 square feet of vinyl asbestos floor tile and associated mastic. |
2012.02.16 - 2012.02.16 | |
| 0184 | 153 South Prospect Street (Bittersweet House) | Room 203
The Physical Plant Training and Compliance Office will cut a 3-6 square foot section of sheetrock wall to remove suspected mold growth and accommodate wall repairs. |
2012.02.08 - 2012.02.08 | |
| 0126 | Cook Physical Science | Room A122
To clean up the lab for reoccupation, Environmental Hazards Management, Inc. will remove 66 sq. ft. of transite table top and miscellaneous lab components. |
2012.01.23 - 2012.01.27 | |
| 0156 | Votey Hall | Room 220
Environmental Hazards Management, Inc. will remove 4.4 sq. ft. of sealer caulking associated with two door frames. |
2012.01.12 - 2012.01.12 | |
| 0160 | Waterman Building | Room 453
The Training and Compliance Office will remove 3 linear feet of thermal system insulation to repair a steam leak. |
2012.01.10 - 2012.01.10 | |
| 328 | Converse Hall | Room 301
The Training and Compliance Office will stabilize paint on the wall and window to prepare for repair and repainting. |
2012.01.09 - 2012.01.09 | |
| 0073 | Given Medical Complex | Room E406A
To facilitate an upgrade to cold room lighting, Environmental Hazards, Inc. will remove existing fixtures (totaling 6 sq. ft. of asbestos rope gasket material), and drill holes in the ceiling (totaling <1 sq. ft. of transite material) for new fixtures. |
2012.01.06 - 2012.01.06 | |
| 0345 | Marsh Hall | Room 100
To accommodate renovations, Environmental Hazards Management, Inc. will remove 200 square feet of vinyl asbestos floor tile and associated adhesive. |
2012.01.03 - 2012.01.05 | |
| 0144 | Southwick Hall | Room 001
TMC Services, Inc. will remove 17 linear feet of asbestos containing pipe insulation. |
2011.12.19 - 2011.12.23 | |
| 0202 | 322 South Prospect Street | Basement
The Physical Plant Training and Compliance Office will perform mold remediation, which will consist of cleaning walls and floor to remove suspected mold growth and wrap 2 linear feet of damaged pipe insulation. |
2011.12.16 - 2012.01.06 | |
| 0156 | Votey Hall | Room 220
To accommodate renovations, TMC Services, Inc. will remove 569 Square Feet of Vinyl Asbestos Floor Tile and associated Adhesive. |
2011.12.21 - 2011.12.23 | |
| 0160 | Waterman Building | Room 001 (Boiler Room)
The Physical Plant Training and Compliance Office will remove 80 linear feet of pipe insulation. |
2011.11.29 - 2011.12.09 | |
| 0102 | Royall Tyler Theatre | Room 109
The Physical Plant Training and Compliance Office will remove fiberglass pipe insulation runs and elbows affected by mold growth. |
2011.11.03 - 2011.12.22 | |
| 0545 | Colchester Research Facility | Rooms 165-169
Environmental Hazards Management, Inc. will remove of 496 square feet of affected sheetrock wallboard, roughly 200 square feet of carpeting and 200 square feet of vinyl floor tile. |
2011.11.16 - 2011.11.21 | |
| 0160 | Waterman Building | Rooms 119 & 507A
In order to repair heating pipes, The Physical Plant Training and Compliance Office will remove 3 linear feet of thermal system insulation from Room 119 & Room 507A. |
2011.11.16 - 2011.11.16 | |
| 0126 | Cook Physical Science | Room A329
In order to repair a valve system, The Physical Plant Training and Compliance Office will remove 2 linear feet of thermal system insulation. |
2011.11.15 - 2011.11.15 | |
| 0957 | CFC HVAC Shop | Room 004
To facilitate the upgrade of three windows, staff from TMC Services, Inc. will remove 9.45 square feet of window caulking. |
2011.11.07 - 2011.11.08 | |
| 0160 | Waterman Building | Hall near Presidents Row
To facilitate renovation of an existing water fountain, the Physical Plant Training and Compliance Office will remove 9 linear feet of in-wall thermal system insulation. |
2011.11.02 - 2011.11.02 | |
| 0160 | Waterman Building | Rooms 123, 123A & 123B
Environmental Hazards Management, Inc. will remove 177 linear feet of thermal system insulation and 662 square feet of ceiling tile and grid. In addition, 232 square feet of vinyl asbestos floor tile and associated mastic will be removed from room 123. |
2011.10.24 - 2011.11.04 | |
| 0042 | 86 South Williams Street | Entire Building
The Physical Plant Training and Compliance Office (TCO) will stabilize window paint. Activity will consist of wet scraping the loose paint, repainting and installing window well inserts.. |
2011.09.13 - 2011.11.25 | |
| 0084 | Stafford Hall | Rooms 123, 123A & 123B
The Physical Plant Training and Compliance Office will perform mold remediation, including removal of roughly 20 square feet of affected sheetrock. |
2011.10.28 - 2011.10.28 | |
| 0126 | Cook Physical Science | Room A142
To facilitate repair of an eye wash station, staff from the Physical Plant Training and Compliance Office will remove 3 linear feet of TSI (mudded elbows). |
2011.10.07 - 2011.10.10 | |
| 0160 | Waterman Building | Exterior East Stairs
Environmental Hazards Management, Inc. will remove 9 square feet of caulking. |
2011.10.06 - 2011.10.06 | |
| 0344 | Marsh-Austin-Tupper Complex | Boiler Room G001
To facilitate repair to pipes, Environmental Hazards Management, Inc. will remove 77 linear feet of thermal system insulation. |
2011.09.26 - 2011.10.07 | |
| 0156 | Votey Hall | Rooms 220 & 224
As part of a renovation, the staff at Physical Plant Training and Compliance Office will remove a total of 5 square feet of sealer caulking. |
2011.09.08 - 2011.09.09 | |
| 0071 | Given Medical Complex, C Hall | Room C022
To facilitate renovation of the room, Environmental Hazards Management, Inc. will remove 2 cubic yards of recyclable concrete block and then move cleaned steel sections out of the room. |
2011.08.29 - 2011.09.01 | |
| 0989 | Centennial Field Complex | Recycle Trailer #2
To facilitate demolition of the trailer, Environmental Hazards Management, Inc. will remove 616 sq. ft of vinyl asbestos floor tile and associated mastic, six windows with associated caulking, and 134 ft of roof tar material. |
2011.08.29 - 2011.08.31 | |
| 0144 | Southwick Hall | Hall 200
Environmental Hazards Management, Inc. will enclose 240 square feet of asbestos containing plaster wall with fiberglass reinforced panels. |
2011.08.17 - 2011.08.26 | |
| 0071 | Given Medical Complex, C Hall | Incinerator C022A & C022B
Environmental Hazards Management, Inc. will remove 139 square feet of boiler insulation and 6 linear feet of roofing gasket and pipe covering. |
2011.08.15 - 2011.08.25 | |
| 0073 | Given Medical Complex | South and West Exterior Windows
To facilitate repair of damaged caulking, Environmental Hazards Management, Inc. will remove 132 square feet of asbestos-containing exterior window caulking. |
2011.07.06 - 2011.08.18 | |
| 0160 | Waterman Building | Hallways 298 & 299
Staff from the Physical Plant Training and Compliance Office will remove 80 square feet of vinyl asbestos floor tile and associated mastic.. |
2011.08.22 - 2011.08.22 | |
| 0160 | Waterman Building | Hall 395
To facilitate repair of a light fixture, the Physical Plant Training and Compliance Office will be removing 6 Square Inches of asbestos-containing decorative ceiling material. |
2011.08.05 - 2011.08.05 | |
| 0160 | Waterman Building | Hallways 298 & 299
Environmental Hazards Management Inc. will remove 425 square feet of vinyl asbestos floor tile and associated mastic. |
2011.08.05 - 2011.08.07 | |
| 0385 | Living & Learning Commons | Exterior
Environmental Hazards Management, Inc. will remove 56 square feet of asbestos containing wallboard and 60 square feet of window caulking. |
2011.07.19 - 2011.07.26 | |
| 0323 | Wright Hall | Bathrooms
Senna and Son Painting, Inc. will stabilize peeling paint on bathroom ceilings. |
2011.07.18 - 2011.08.03 | |
| 0321 | Christie Hall | Bathrooms
Senna and Son Painting, Inc. will stabilize peeling paint on bathroom ceilings. |
2011.07.18 - 2011.08.03 | |
| 0408 | Mercy Hall | Hall 193
Environmental Hazards Management, Inc. will remove 1326 square feet of carpeting, and 1326 square feet of vinyl asbestos floor tile and associated adhesive. |
2011.07.11 - 2011.07.14 | |
| 0126 | Cook Physical Science | Rooms A110, A111, A115 and A117
Environmental Hazards Management, Inc. will remove asbestos containing pipe covering, fume hoods, transite ductwork, asbestos board, countertops and peg board. |
2011.06.20 - 2011.07.08 | |
| 0176 | 31 South Prospect Street (Benedict House) | Windows, Fascia Trim and Front Porch
Environmental Hazards Management will stabilize paint on all windows throughout the building, on the fascia trim and front porch. |
2011.05.31 - 2011.07.28 | |
| 0352 | Mason Simpson Hamilton Complex | Exterior and Interior, Various Rooms
As part of a planned renovation, Environmental Hazards Management, Inc. will remove 4100 square feet of vinyl asbestos tile, mastic and exterior window caulking, and 2160 square feet of textured ceiling material. |
2011.05.16 - 2011.07.08 | |
| 0160 | Waterman Building | Room 525A
Environmental Hazards Management, Inc. will remove 100 square feet of carpeting, and 100 square feet of vinyl asbestos floor tile and associated mastic. In addition, paint on two window frames will be stabilized. |
2011.06.22 - 2011.06.23 | |
| 0176 | 31 South Prospect Street (Benedict House) | Rooms 096, 106 and 109
Environmental Hazards Management, Inc. will remove 34 linear feet asbestos containing insulation. |
2011.06.13 - 2011.06.15 | |
| 0156 | Votey Hall | Mechanical Room
To facilitate a steam station upgrade and valve replacement, Environmental Hazards Management, Inc. will remove 9.5 linear feet of thermal system insulation. |
2011.06.06 - 2011.06.07 | |
| 0416 | 256 Colchester Ave | Rooms 104 & 104A
Environmental Hazards Management, Inc. will remove wallboard and flooring material affected by a recent water intrusion. |
2011.06.06 - 2011.06.07 | |
| 0036 | Bailey Howe Library | Rooms 102, 122 & 122A
As part of planned office space renovations, staff from Environmental Hazards Management will be removing 950 square feet of carpet, vinyl asbestos floor tile and associated adhesive. |
2011.06.01 - 2011.06.09 | |
| 0407 | McAuley Hall |
Exterior Car Port
Environmental Hazards Management, Inc. will remove 1112 square feet of asbestos containing plaster ceiling. |
2011.05.16 - 2011.05.20 | |
| 0012 | Ira Allen Chapel |
Room 201
The Physical Plant Training & Compliance Office will be stabilizing lead paint on the window and wall. |
2011.05.10 - 2011.05.10 | |
| 0001 | 284 East Avenue |
Room 132A/B
The Physical Plant Training and Compliance Office will be removing approximately 94 square feet of carpeting and associated adhesive. |
2011.05.09 - 2011.05.09 | |
| 0126 | Cook Physical Science |
Room A141
To facilitate repair of an eye wash station, staff from the Physical Plant, Training & Compliance Office will remove 2.5 linear feet of TSI (mudded elbows). |
2011.05.04 - 2011.05.04 | |
| 0126 | Cook Physical Science |
A002 North End Generator Room
To facilitate a generator upgrade, Environmental Hazards Management, Inc. will remove 70 square feet of generator exhaust breeching, sealer and mastic, and 50 linear feet of pipe covering. |
2011.05.02 - 2011.05.12 | |
| 0074 | Rowell |
Room 199
Environmental Hazards Management, Inc. will remove 34 square feet asbestos containing transite from a ceiling soffit. |
2011.04.26 - 2011.04.27 | |
| 0160 | Waterman Building |
Rooms 343, 343A, 343B & 344
Environmental Hazards Management, Inc. will remove 285 square feet of asbestos containing plaster ceiling material. |
2011.04.21 - 2011.05.06 | |
| 0122 | Perkins Hall |
Room 003A
To accommodate repairs, Environmental Hazards Management will remove 257 square feet of vinyl asbestos floor tile and associated adhesive. |
2011.04.13 - 2011.04.15 | |
| 0160 | Waterman Building |
Room 212
Environmental Hazards Management, Inc. will remove a contaminated ceramic block chase, a copper duct vent pipe and associated duct seam sealant, totaling roughly 3 square feet of asbestos. Upon completion, a visual clearance will be performed by a Training and Compliance Office representative. After the visual clearance has been passed, the remaining ceramic block wall will be taken down and disposed of as construction and demolition debris. |
2011.04.04 - 2011.04.06 | |
| 0073 | Given Medical Complex |
Room E215D, E215E, E215F & E215H
To facilitate renovations, Environmental Hazards Management will be removing vermiculite from under the windows in the above mentioned rooms. |
2011.03.28 - 2011.03.30 | |
| 0073 | Given Medical Complex |
Room E311A
The Physical Plant Training and Compliance Office will remove 1 linear foot of thermal system insulation and 3 square feet of vinyl asbestos floor tile and mastic. |
2011.03.23 - 2011.03.23 | |
| 0082 | Hills Building |
Room 016
The Physical Plant Training and Compliance Office will be removing 2 1/2 linear feet of damaged thermal system insulation. |
2011.03.09 - 2011.03.09 | |
| 0126 | Cook Physcial Science |
Room A121
To facilitate repairs, staff from the Physical Plant, Training & Compliance Office will remove two linear feet of mudded pipe joint fittings. |
2011.03.08 - 2011.03.09 | |
| 0073 | Given Medical Complex, E Hall |
Interior & Exterior of E213 & E215D
To accommodate the removal of windows, Environmental Hazards Management will remove 6 square feet of asbestos containing glazing from the windows. A consultant from the Training & Compliance Office will monitor the project. |
2011.03.07 - 2011.03.08 | |
| 0160 | Waterman Building |
Rooms 212, 214, 215, 215A
Environmental Hazards Management, Inc. will remove 180 linear feet of asbestos containing pipe covering and 650 square feet of asbestos containing plaster ceiling. |
2011.02.08 - 2011.02.25 | |
| 0094 | Nicholson House, 41 South Prospect Street |
Room 003
To facilitate a boiler upgrade, Environmental Hazards Management, Inc. will be removing 44 sq. ft. of asbestos containing boiler rope gasket and paper duct insulation. |
2011.01.31 - 2011.02.04 | |
| 0016 | 109 South Prospect Street |
Room 004 (Basement Conference Room)
The Physical Plant Training & Compliance Office (TCO) will be stabilizing 6 sq. ft. of painted wall affected by calcium mineralization. |
2011.01.11 - 2011.01.12 | |
| 0086 | Marsh Life Science |
Various Locations on the 1st, 2nd and 3rd Floors
To facilitate the renovation of lab and office space, Environmental Hazards Management, Inc. will remove 1016 square feet of countertop, 282 square feet of fume hood, and 3 linear feet of thermal system insulation. |
2011.01.10 - 2011.07.10 | |
| 0156 | Votey Hall |
Room 365
As part of an existing renovation, Environmental Hazards Management, Inc. will remove 570 square feet of floor tile and mastic and 3 square feet of countertop and associated mastic. |
2010.12.22 - 2010.12.27 | |
| 0072 | Given Medical Complex |
Rooms E210, E208 & E297
Environmental Hazards Management, Inc. will remove 774 square feet of spray applied fireproofing and 1472 square feet of floor tile and mastic. |
2010.12.20 - 2011.01.22 | |
| 0086 | Marsh Life Science |
Rooms 228, 228A, 230, 230A, 232, 234, 234A, 236 & 236A
Environmental Hazards Management, Inc. will remove 17 linear feet of thermal system insulation, 480 square feet asbestos containing lab benches and 1848 square feet of floor tile and mastic. |
2010.12.07 - 2010.12.16 | |
| 0122 | Perkins Building |
Room 110
To accommodate repairing damaged flooring, staff from Training & Compliance Office will be removing 80 Square Feet of Vinyl Asbestos Floor Tile and associated Adhesive. |
2010.11.19 - 2010.11.19 | |
| 0160 | Waterman Building |
Suite 113 - Phase II
To facilitate the replacement of damaged carpeting staff from Environmental Hazards Management will remove 1041 square feet of carpet, vinyl asbestos floor tile and associated adhesive. |
2010.11.19 - 2010.11.21 | |
| 0012 | Ira Allen Chapel |
Room I201
To facilitate the repair of window plaster, Physical Plant Training & Compliance Office will be stabilizing approximately 10 square feet of plaster and window paint. |
2010.11.16 - 2010.11.17 | |
| 0073 | Given Medical Complex |
Exterior windows outside of Room E201 & E203
Environmental Hazards Management will resume the removal of <10 Square Feet of exterior window caulking. |
2010.11.15 - 2010.11.16 | |
| 0160 | Waterman Building |
Suite 113 - Phase I
To facilitate the replacement of damaged carpeting staff from Environmental Hazards Management will remove 919 square feet of carpet, vinyl asbestos floor tile and associated adhesive. |
2010.11.12 - 2010.11.14 | |
| 0088 | Aiken Hall |
Exterior
For planned renovations, Environmental Hazards Management will remove 20 linear feet of exterior abandoned insulated steam pipe in the ground at Aiken Hall. |
2010.11.11 - 2010.11.11 | |
| 0073 | Given Medical Complex |
Exterior windows outside of Room E201 & E203
To accommodate the replacement of exterior window caulking, Environmental Hazards Management will be removing <10 Square Feet of exterior window caulking. |
2010.11.10 - 2010.11.10 | |
| 0134 | Dewey Hall |
Hallway 371 outside Room 346
In support of routine maintenance, The Physical Plant Training and Compliance Office will remove 2 linear feet of thermal system insulation. |
2010.11.09 - 2010.11.09 | |
| 0160 | Waterman Building |
Room 205P
To facilitate repairs of a steam line, staff from the Physical Plant, Training & Compliance Office will be removing 4 square feet of sheet rock and up to 6 linear feet of thermal system insulation. |
2010.10.26 - 2010.10.28 | |
| 0157 | Kalkin Building |
Room 006 & Hall 095
The Physical Plant Training and Compliance Office will perform mold remediation, which will consist of cutting out 30 sq. ft. of affected sheetrock. |
2010.10.14 - 2010.10.19 | |
| 0160 | Waterman Building |
Rooms 540, 541 & 541A
To facilitate repairs, Environmental Hazards Management, Inc. will be removing 428 sq. ft. of asbestos containing plaster ceiling and 720 sq. ft. of asbestos containing floor tile. |
2010.10.11 - 2010.10.28 | |
| 0082 | Hills Building |
Room 017
In support of routine maintenance, Environmental Hazards Management, Inc. will remove 1/2 linear feet of thermal system insulation. |
2010.10.07 - 2010.10.07 | |
| 0130 | Pomeroy Hall |
Room 200
The Physical Plant Training and Compliance Office will perform a post mold remediation inspection. The inspection is performed to confirm if indoor mold levels are at or below typical outdoor levels or at levels associated with various studies of "clean" buildings. |
2010.09.30 - 2010.09.30 | |
| 0090 | Mansfield House |
Basement
The Physical Plant Training and Compliance Office will remediate mold present on 70 sq. ft. of interior cobble stone walls, and stabilize the painted surface. |
2010.09.28 - 2010.10.06 | |
| 0072 | Given Medical Complex |
Room D107G
In support of routine maintenance, The Physical Plant Training and Compliance Office will remove 2 linear feet of thermal system insulation. |
2010.09.24 - 2010.09.25 | |
| 0145 | Music Building |
Exterior
To accommodate the repair of a failing caulking system, the Physical Plant Training & Compliance Office will be removing 1134 linear feet of caulking. |
2010.09.27 - 2010.10.27 | |
| 0040 | Billings Center |
Rooms B211 & B208
The Physical Plant Training and Compliance Office will remove 5 sq. ft. of sheetrock from room B211 and 4 ceiling tiles from room B208. |
2010.09.23 - 2010.09.23 | |
| 0073 | Given Medical Complex |
Hall E, Room E309B
Environmental Hazards Management, Inc. will remove 180 Square Feet of Carpet, Vinyl Asbestos Floor Tile and Associated Adhesive. |
2010.09.09 - 2010.09.09 | |
| 0016 | 109 South Prospect Street |
Level 3 (2nd Floor)
The Physical Plant Training & Compliance Office (TCO) will be stabilizing window paint. Activity will consist of wet scraping the loose paint, repainting and installing window well inserts. |
2010.09.08 - 2010.09.17 | |
| 0074 | Rowell Medical Complex |
Exterior West Handicap Walkway
Environmental Hazards Management will remove 9 square feet of asbestos containing caulking in the expansion joint of the concrete walkway. |
2010.08.25 - 2010.08.25 | |
| North Campus Steam Line |
To upgrade pipes, Environmental Hazards Management will remove 1820 linear feet of steam and condensate line. |
2010.06.02 - 2010.10.01 | ||
| 0082 | Hills Building |
Room 022
Environmental Hazards Management Inc. will be removing 340 sq. ft. of asbestos ceiling tile. |
2010.08.23 - 2010.08.25 | |
| 0385 | Living & Learning Commons |
Room 102A and 103A
To facilitate replacement of a kiln, Environmental Hazards Inc. will be removing 1 sq. ft. of gasket material and 26 sq. ft. of asbestos transite. |
2010.08.23 - 2010.08.26 | |
| 0134 | Dewey Hall |
Room 410A, 410B, 410C
Environmental Hazards Management will scrape and stabilize 68 square feet of damaged plaster wall. |
2010.08.16 - 2010.08.18 | |
| 0144 | Southwick Hall |
Room 200A-200E
Environmental Hazards Management, Inc. will enclose a 256 square feet asbestos containing plaster wall with white formica board. |
2010.08.16 - 2010.08.19 |