FFY 2010 Research Projects
NETC 10-1
PROJECT TITLE: Synthesis of Practice: Electronic Bridge Inspection Document Managements
STATUS: This project will be compared against the 2012 Research Need Statements to determine if the research is still a priority for the NETC
ANTICIPATED COMPLETION: To be determined
PRINCIPAL INVESTIGATOR(S): To be determined
PI E-MAIL: To be determined
PROJECT OBJECTIVES: To conduct a synthesis of practice, among states and turnpike authorities, on the topic of electronic bridge inspection document management systems.
NETC 10-2
PROJECT TITLE: A Field Evaluation of SuperPave Hot Mix Asphalt Pavement Containing 30% RAP
STATUS: Project Dropped
ANTICIPATED COMPLETION: To be determined
PRINCIPAL INVESTIGATOR(S): To be determined
PI E-MAIL: To be determined
PROJECT OBJECTIVES: To perform a performance and durability field evaluation of HMA pavement containing higher percentages of RAP (20-30%) as compared to virgin HMA pavement and HMA containing 15% RAP (serving as experimental controls).
NETC 10-3
PROJECT TITLE: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology
STATUS: RFP pending
ANTICIPATED COMPLETION: To be determined
PRINCIPAL INVESTIGATOR(S): To be determined
PI E-MAIL: To be determined
PROJECT OBJECTIVES: To evaluate the low temperature cracking properties and moisture susceptibility of RAP mixtures produced with warm mix technologies.
NETC 10-4
PROJECT TITLE: Field Evaluation of Corrosion Protection on Bridges with a Spray Application of Disodium Tetrapropenyl Succinate (DSS)
STATUS: Project Dropped
ANTICIPATED COMPLETION: To be determined
PRINCIPAL INVESTIGATOR(S): To be determined
PI E-MAIL: To be determined
PROJECT OBJECTIVES: To study the effectiveness of a spray-applied DSS-Hycrete solution at inhibiting new chloride ion penetration and/or reducing active corrosion rates in existing reinforced concrete structures that are exhibiting corrosion of reinforcement.