GEOHYDROLOGY SCHEDULE -- 1999 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Monday 1:25 TO 3:15 |
|
|
Wednesday 1:25 TO 5:15 |
|
SATURDAY |
|
|
|
|
(DISCUSSION AND HANDS-ON) |
|
|
(LABORATORY) |
|
or SUNDAY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
January |
20 |
Introduction to the hydrologic cycle |
email |
|
|
|
|
|
|
|
300 |
Class procedures |
aiken |
|
|
|
|
|
|
|
|
hydrologic cycles exercise |
|
|
|
|
|
|
|
|
|
Setup e-mail |
|
|
|
|
|
|
|
|
|
|
|
SATURADY |
|
January |
|
25 |
Precipitation and infiltration |
January |
27 |
Introduction to Lakes, coring, and surveying |
|
30-Jan |
|
|
|
200 |
flow paths and runoff |
|
300 |
Methods for basin-wide precipitation analysis |
|
Lake trip |
|
|
|
|
Read D+L Chapter 1, 6 and 9 |
|
|
Read D+L Chapter 2 |
|
7:30-6:30 |
|
|
|
|
Hand in Caesar |
|
|
Review Field manual 1, 2, 3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
February |
|
1 |
Statistics, stochastics and frequency |
February |
3 |
Lake Trip data reduction |
|
|
|
|
|
300 |
randomization exercise |
|
LL |
core opening, digitizing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
February |
|
8 |
Hydrographs -- their meaning and analysis |
February |
10 |
Precipitation Frequency Analysis |
|
|
|
|
|
300 |
Read D+L Chapter 10 |
|
300 |
Review D+L Chapter 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SUNDAY |
|
February |
|
15 |
---------- (NO CLASS)---------- |
February |
17 |
Snow, character, metamorphism and |
|
21-Feb |
|
|
|
|
|
|
200 |
avalanche hazard |
|
Snow trip |
|
|
|
|
|
|
|
Read Xerox from Avalanche Handbook, Chap 2+3 |
|
7:30-5:00 |
|
|
|
|
|
|
|
Hand in Lake Report |
|
|
|
|
|
|
|
|
|
Read Snow sense in its entirety |
|
|
|
|
|
|
|
|
|
|
|
|
|
February |
|
22 |
Snow melt hydrology |
February |
24 |
Snow trip data reduction |
|
|
|
|
|
300 |
Read D+L Chapter 13 |
|
300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March |
|
1 |
Run-off, the empirical approach |
March |
3 |
---------- (NO CLASS)---------- |
|
|
|
|
|
200 |
Rivers -- Geometry and behavior |
|
|
|
|
|
|
|
|
|
Read D+L Chapters 11 and 16 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March |
|
8 |
Flood frequency analysis |
March |
10 |
Calibration of Vermont run-off/.basin area |
|
|
|
|
|
300 |
Review D+L Chapter 10, 11, 16 |
|
300 |
Hand in Snow trip report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March |
|
15 |
---------- (NO CLASS)---------- |
March |
17 |
---------- (NO CLASS)---------- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March |
|
22 |
Ground water basics -- Round 1 |
March |
24 |
Darcy tube |
|
|
|
|
|
200 |
snow trip report returned |
|
LL |
Read Geo ed paper by Warner |
|
|
|
|
|
|
Read D+L Chapter 7 |
|
|
|
|
|
|
|
|
|
Read GWW Chapter 5 -- on reserve |
|
|
|
|
|
|
|
|
|
Read Field Manual chapter 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
March |
|
29 |
Ground water basics -- Round 2 |
March |
31 |
Flownets and flow demonstrators |
|
|
|
|
|
200 |
snow trip report revisions due |
|
LL |
Read Field Manual Chapter 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
April |
|
5 |
---------- (NO CLASS)---------- |
April |
7 |
Flow equations and pumping tests |
|
|
|
|
|
|
|
|
300 |
Point and pumping test data reduction |
|
|
|
|
|
|
|
|
|
Read Field Manual Chapter 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
April |
|
12 |
What makes up an aquifer and |
April |
14 |
Slug tests and well measurements |
|
|
|
|
|
200 |
important regional aquifers |
|
field/300 |
Read Field Manual Chapter 9, review Chap5 |
|
|
|
|
|
|
Read GWW Chapter 3 and 7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SATURDAY |
|
April |
|
19 |
Well design +installation |
April |
21 |
Town Line Brook Field trip |
|
24-Apr |
|
|
|
200 |
Read GWW Chapter 10 and 13 |
|
field |
Read Field Manual Chapter 6 |
|
Slope Trip |
|
|
|
|
Read Field Manual Chapter 7, 8 |
|
|
|
|
8:30 - 5 |
|
|
|
|
|
|
|
|
|
|
|
April |
|
26 |
Hillslope processes and hydrology |
April |
28 |
Slope stability calculations |
SLOPES |
|
|
|
|
200 |
Read D+L Chapter 15 |
|
300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
May |
|
3 |
---------- (NO CLASS)---------- |
May |
5 |
Poster Presentations on Slope Trip |
|
|
|
|
|
|
|
|
200 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTES: BOLD indicates as assignment due the day listed |
|
|
|
|
|
|
|
|
|
Numbers under each date indicate where we will meet |
|
|
|
|
|
|
|
|
|
200 = Perkins Room 200; 300 = Perkins Room 300 computer lab; LL = lake lab, Perkins Room 102 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|