Date

Topic
(Weeks may be switched depending on availability of well drillers)

 

Description

8/31

meet in Hills 234

Week 1

Introduction

 

Description of lab projects

Preparation for Lab 2

QA/QC / spelling

9/7

meet at site (Spear St. below UVM farm)

Week 2

Stream sampling, mock contaminant spill

Deadline for choosing lab project.

Potash Brook: Measure flow and dispersion of a contaminant "spill".  Demonstrate sampling. Take samples for Lab 3.  

9/14

Aiken 202,

Hills 20,

Hills 135

 

Week 3

Chemical and biologicial analysis of stream samples

Split:

  1. TSS
  2. BOD,  fecal coliforms
  3. Soluble Reactive Phosphorus

9/21

various locations

Week 4

Project planning with consultants

Arrange a meeting with your consultant during this lab period if they are available. Otherwise, arrange a meeting during the preceding or following week.

9/28

meet at ESF

Week 5

Groundwater sampling

Methods--baler, pump, etc.

Sample wells

Chain of custody forms

10/5
various locations

Week 6

Project

Lab dedicated to group projects

  

 10/12

meet at Aiken or near ESF

Week 7

Well installation,

Soil sampling.

   a. Well drilling and installation, well log.

   b. Sample field for metal analysis, Inspect soil pits.

 

10/19

Aiken 202,

Hills 224

Week 8

Soil extraction and analysis, instrumental methods

   Split:

  1. EPA method 8080A, Extracts soils and controls

     b.   Demonstrate ICP and IC

10/26

various locations

Week 9
Project

 


Lab dedicated to group projects.

11/2
meet at Aiken  or at wetland

 

Week 10
Field methods

Demonstration by groups of wet/dry precipitation sampler, weather station, ISCO, constructed wetland, monitoring wells, slag filters, etc.

11/9

TBA

Week 11

Air Quality Sampling

Last possible date to submit samples to Don Ross for analysis is November 9th

11/16

Week 12

Project

Meet with consultants to review compiled data.

11/23

 

Week 13

THANKSGIVING

 

11/30

Hills 234

Week 14

Group project reports