Schedule-2007

  Date Topic Assignment
1

Aug 27

fossil fuels

solar history

For next time:
5 page paper on solar history or energy policy.

  Sept. 3 Labor Day Holiday  
2 Sept 10 2004 Green building materials. Maura O'Dea from Green Building network.

2005 Vermont Builds Greener/Residential LEED program

Due: Paper on solar history

For next time:
1) Read Chapter 6 & 8 in Chiras Book
2) Research Green building methods and materials for 4 minute presentation. Please let me know what you're doing. powerpoint is preferable, but not required.

3 Sept 17 Green Building Material Presentations

Due: ppt Presentation on green building materials

For next time: Read Chapter 1,2,3 in Chiras Book

4 Sept 24 Intro to Passive Design:
Autonomous 100% solar design principles
Class design project spreadsheet
Continue presentations on Green building

Due: Reading

For next time:
Read Chapter 4,5,7 in Chiras Book

5 Oct. 1

Passive Design:
James Burde case studies

Green Building tour day.
Green Home tour website
Please read and pick a location to visit

Due: Reading

For next time: Pick up a digital camera at the media center, downstairs in the library, on Friday and take pictures of the solar home you visit. Show pictures on Monday. Bring CD with pictures or email to me.

  Oct 6-Sat Green Home tour

For next time:
Take pictures and notes!

6 Oct. 8 Passive Design: Drawing, Windows, Energy Calculations

Due: Show pictures and notes from Green Home tour

For next time: Work on drawings 6 views

7 Oct. 15 Passive Design: Thermal mass, overhang, backup heating

Due: 6 view drawings

For next time: Work on drawings

8 Oct. 22
Passive Design: Review of passive design principles

Due:

For next time: Passive design drawings other parts

9 Oct. 29

Passive design preliminary review.

Solar Hot Water
Solar Hot water Systems, solar decathlon, contractors-

Due: Preliminary design

For next time:solar H2O homework and select a system

read:
Solar hot water article #2 from Home Power

10 Nov. 5

Load calculations:

Photovoltaic systems load calculations,

Due: Solar H2O homework and select a Solar H2O system

For next time: PV systems HW1: load calculations from spreadsheet.

11 Nov. 12

Photovoltaic systems design and component selection

Photovoltaic Systems Integration: off-grid, grid intertie, battery backup, etc.

Due: PV HW1

For next time: PV systems HW2

Choose PV components. Installer list:

http://www.revermont.org/installers.php

  Nov. 19 Thanksgiving Holiday

 

12 Nov. 26

Topic: Photovoltaics. PV System selection.
Review for presentation

Due: PV HW2

For next time: Prepare for final Design review. finish up missing pieces.

13 Dec. 3 Final Design Review - Integrated solar house design presentation: Outside Design review Panel

Due: Final design review

For next time: Write final report

14 Dec. 10 Final Report Due

Due: Final Report Due